> Ozarks Construction and Renovation | HVAC unit goes into place

HVAC unit goes into place

by Don Lee 14. March 2011 21:52

With a run of nice weather, construction continues at a rapid pace here on campus. At the expanded Seay Student Center, ductwork is going up inside, brick and block on the exterior, and as the pictures show below, the massive heating and air-conditioning unit has been put in place and connected.

 

Across the street at Trustee Hall, fire protection work is underway, as well as electrical, door frames, and exterior sidewalks, as well as a parking lot curb.

 

 

Tags: